Supply or Supply & Erect Service
At a glance: For quality, warranty and lender confidence, our default delivery route is Supply & Erect.
Scope — what’s included
Supply & Erect
- Factory manufacture of the superstructure per approved drawings/specification.
- Insulation within structure.
- Rooflights (Supplied only)
- External doors and windows.
- Membranes.
- Internal partitions (Non-load bearers supplied only)
- Erection by an approved team (method statements, risk assessments, lift plan and programme).
- Setting-out checks, tolerance control, membranes/tapes to spec and weather-tight shell to the agreed stage.
- On-site QA checklists, sign-off and warranty enablement; two site visits (pre-delivery and handover).
Stage payments
| Milestone |
Supply only |
Supply & Erect |
| Deposit |
£950 (non-refundable) |
£950 (non-refundable) |
| Stage 01 — Building Warrant Draft |
10% (cumulative 10%) |
10% (cumulative 10%) |
| Stage 02 — Building Warrant Final |
10% (cumulative 20%) |
10% (cumulative 20%) |
| Stage 03 — Window Order |
20% (cumulative 40%) |
20% (cumulative 40%) |
| Stage 04 — Prior to Kit Manufacture |
60% (cumulative 100%) |
40% (cumulative 80%) |
| Stage 05 — Delivery / First Load |
Expenses invoice at delivery |
17.5% (cumulative 97.5%) |
| Stage 06 — Post Erection |
— |
2.5% (cumulative 100%) |
| Stage 07 — Expenses |
— |
Expenses invoice |
- Payments due within 5 days of invoice unless stated otherwise.
- Prices provisional until engineering/site information known; reviewed at each stage.
- Steel confirmed after Stage 2; budget valid 3 months from issue.
- VAT excluded unless installation supply applies.
- Late payment may trigger interest; goods not dispatched if terms unmet.
- Cancellation fee 10% after Stage 2, plus costs incurred.
Responsibilities & interfaces
Client / Principal Contractor provides
- Site access for 12m articulated lorry / 15m trailer; off-loading within 2 hours; Buyer responsible for off-load facilities.
- Lay-down & hardstanding: 14-ton axle load area for panels/insulation; 3m perimeter hardstanding (≈5-ton axle load) around base; pre-assembly area if roof panels require.
- Foundations: correctly constructed; slab/base levelled to within ±10mm; setting-out to agreed datum.
- Full external perimeter scaffold (3 sides prior to start, fourth before roof install) to erection team’s acceptance; unsafe scaffold must be replaced.
- Welfare (toilet, drying, canteen), power (240v or min. 7.5KVA generator; diesel by client), skips, security and traffic management.
- Telehandler/crane for lifts (charged at cost if arranged by HebHomes); 5m mobile towers (2m & 3m configs); compliant fall-protection system (e.g., G-deck).
- Crane base
- Access hours 08:30–18:30 Mon–Sat unless otherwise agreed; inform HebHomes of unusual site features/constraints.
HebHomes / Erection Team provides
- Trained site labour; method statements; risk assessments; programme; lift plan; specialist tools/equipment (transformer 110v, compressor, air tools).
- Manufacturing/assembly drawings and on-site QA; pre-delivery inspection and post-erection handover visit.
- Installation to our programme and construction drawings; weather-dependent sequencing.
Ownership, guarantees & approvals
- Ownership transfers on delivery (Supply only) or post-erection handover (Supply & Erect), once paid in full.
- Hemsec SIP / Sigma II are BBA-approved; manufacturer product guarantees apply.
- Liability cap: £500,000 (excluding personal injury/death). No liability for consequential loss.
- Design obligations: HebHomes provides kit working drawings & structural calcs for the kit; client’s engineer must certify foundations and non-kit elements.
- Draft SAP provided for warrant; EPC can be provided at completion (additional fee).
Common Questions
Is CPS available as Supply Only? ›
No. CPS is supplied only with Supply & Erect.
Can I purchase SIPs as Supply only? ›
Technically possible, but not advisable. Use Supply & Erect with specialist teams.
When are payments due? ›
Deposit, then staged invoices at Warrant Draft/Final, Window Order, prior to Manufacture, Delivery/First Load, Post-Erection, plus an expenses invoice. Payments due within 5 days of invoice unless otherwise stated.
What access and ground conditions are required? ›
Access for a 12m artic / 15m trailer; off-load within 2 hours; 14-ton hardstanding lay-down; 3m perimeter hardstanding (~5-ton); base level ±10mm; clear working area and pre-assembly area if needed.
Who provides scaffold, welfare, power and crane/telehandler? ›
Client provides scaffold, welfare, power, skips and crane/telehandler (or we arrange at cost). Under S&E we agree interfaces at Pre-Start; our team prepares the lift plan and supervises lifts.
What base tolerance is required? ›
Slab/base levelled to within ±10mm; foundations by client’s engineer; setting-out to agreed datum.
What are site hours and notifications? ›
08:30–18:30 Monday–Saturday or as agreed. Tell us about any unusual site constraints in advance.
Are travel, accommodation and telehandler/crane included? ›
No. Excluded and charged at cost (or provided by the client). Estimate issued after Stage 2; reconciled post-erection.
When does ownership transfer and who insures? ›
Client insures from delivery. Ownership transfers at delivery (Supply only) or at handover (S&E) once paid as per contract.
Do you provide foundation design or SER certification? ›
No. We provide kit drawings and calcs only. Your engineer/agent provides foundations and certification. Planning & Warrant available under a separate contract.
What’s included in the CPS kit under Supply & Erect — CPS (Closed Panel System)? ›
- Ground & first floor: DPC (under wall plate), perimeter soleplate, floor cassette with 254mm posi-joists, 22mm MR T&G chipboard factory-fitted, rim board.
- External walls (closed panel): 47×235mm I-Studs fully filled with blown-fibre insulation; 9mm OSB both faces; 25×38mm internal service battens; foam air seals to head/base/joints; breather membrane factory-fitted (reflective/UV-stable per finish); all fixings.
- Internal load-bearing walls: prefabricated panels with 38×89mm CLS studs, OSB lining to one side where required by the structural engineer.
- Roof (habitable zones): roof cassette panels with 300mm I-Studs filled with mineral wool; 9mm OSB internal face; 25×38mm internal service battens; external roofing membrane.
- Single-storey roofs: fink trusses + sarking/OSB (to engineer specification).
- Openings: windows & external doors to the project schedule (installed under S&E); rooflights with flashings/thermal collars supplied, not installed.
- Ancillaries: structural posts/beams as required; steelwork/trusses as designed (confirmed after engineering).
- Vapour control (CPS): no VCL required to walls—use foil-backed plasterboard; strips fitted behind junctions to enable later continuity at coomb/joins.
What’s included in the SIP kit under Supply & Erect — SIP (Structural Insulated Panels)? ›
- Ground & first floor: DPC (under wall plate), perimeter soleplate; metal-web floor joists with hangers; 22mm MR T&G chipboard; rim board.
- External walls (Hemsec SIP): c.150mm SIPs with solid timber splines; OSB full face internally & externally; breather membrane (e.g., TF200 Thermo or Tyvek UV facade) and all SIP fixings.
- Internal load-bearing walls: SIP load-bearing panels and sheathed studs to engineer design.
- Roof (habitable zones): SIP roof panels (typically 150mm; 175mm if required) with roofing membrane (e.g., VP400) and fixings.
- Single-storey roofs: fink trusses + sarking/OSB where applicable.
- Openings: windows & external doors to the project schedule (installed under S&E); rooflights with flashings/thermal collars supplied, not installed.
- Ancillaries: structural posts/beams as required; steelwork/trusses as designed (confirmed after engineering).
- Vapour control (SIP): VCL (foil & tape) supplied, not installed; strips fitted behind external junctions so the VCL can be completed after kit erection.
What’s not included in the kit? ›
- Groundworks/sub-structure, cladding, final roof coverings, external battens, ties to block/brick, firestops.
- Non-structural bulkheads, false ceilings, decking.
- Steel — charged at cost.
- Scaffold, welfare, power, skips; transport/accommodation/subsistence; telehandler/crane (charged at cost if we arrange).
Under S&E, all listed kit elements are installed unless marked “supplied, not installed” above.